Service Hotline:4001843424
The practice of hybrid plastic track
- Categories:News
- Author:Tianbigao Sports
- Origin:Tianbigao Sports
- Time of issue:2021-04-05
- Views:0
(Summary description)The method of hybrid plastic runway is slightly different from other plastic runways. Because of the difference in structure and performance, the materials are mainly used in different places. Secondly, the construction process and the requirements for the foundation are different.
The practice of hybrid plastic track
(Summary description)The method of hybrid plastic runway is slightly different from other plastic runways. Because of the difference in structure and performance, the materials are mainly used in different places. Secondly, the construction process and the requirements for the foundation are different.
- Categories:News
- Author:Tianbigao Sports
- Origin:Tianbigao Sports
- Time of issue:2021-04-05
- Views:0
The method of hybrid plastic runway is slightly different from other plastic runways. Because of the difference in structure and performance, the materials are mainly used in different places. Secondly, the construction process and the requirements for the foundation are different.
1. Waterproof primer
After the foundation of the mixed-type plastic track is sufficiently dry, roll the waterproof primer evenly on the construction site with a roller. Its function: penetrate into the fine pores of the foundation, block the ground water vapor and strengthen the base surface after curing.
2. Leveling and repairing
After the bottom layer is dry, use the bottom material of the runway to add particles to the water accumulation area circled by the water spraying, then add an appropriate amount of thinner to mix evenly and adjust to the consistency of the construction, use a ruler or scraper to scrape and level the water accumulation; repair; Always pay attention to trimming, do not allow the repaired side to be higher than the base surface. If it is higher, it must be polished after curing before the spray surface construction can be carried out.
3. Bottom of the runway
The bottom material of the hybrid plastic track is 1:5 track bottom material and particles with a particle size of 2-4 mm. Put the track bottom material, particles, diluent, and drier into the mixer and mix evenly (the maximum amount of particles It is 40% of the bottom material of the runway, the amount of thinner is 2%-3% of the bottom material of the runway, and the amount of drier is 0.5% of the bottom material of the runway.) Then pour it into the construction area and use a steel pipe with a predetermined thickness. Paving, the thickness is 10mm.
4. Runway spray surface
The surface material of the hybrid plastic track is 1:2 track finish and EPDM particles with a particle size of 1-3 mm. Put the track finish, EPDM particles, thinner, and drier into the mixer and stir evenly ( The ratio of runway topcoat to EPDM particles is 1.2:1, the amount of thinner per square meter of runway topcoat is 0.12 kg, and the amount of drier is 0.5% of the runway topcoat.) Then pour it into the sprayer and spray it. Spray in different directions in two passes. After the first pass, check the effect of the whole field, and re-spray the uneven areas with a thickness of 3mm.
5. draw a line
The line drawing material is 1:1 or 1:9 white line drawing paint. Use a steel ruler to divide the dividing line, use steel nails to fix the points, and then use a line with a certain degree of toughness to connect the points of the straight line. Stir component A and component B of the line drawing paint evenly, then pour it into the spray gun, and spray the line with a well-designed 5cm wide template.
Guangdong Tianbigao Sports Technology Co., Ltd. is a diversified development enterprise integrating runway material research and development, product production, site construction, and supporting product sales. It has an independent factory, 18 years of product development and production experience, obtained a number of national patents and qualification certifications, and provides integrated solutions for sports engineering. Based on the company's mature self-production and self-sales model, professional on-site construction team, and perfect after-sales service system, it can provide services such as unconditional door-to-door maintenance during the warranty period, acceptance and confirmation according to the construction progress, and then charging. The quality of products and construction has been recognized by more than 300 primary and secondary schools, sports colleges and other public institutions across the country, and has obtained the national first-level runway certification and multiple second-level sports venue certifications. Wealth Hotline: 4001843424
Scan the QR code to read on your phone
1
Contact
Follow us!
Contact Tianbi Gao
Contact us
Add: Industrial Park, Shishun Village Committee, Lishui Town, Nanhai District, Foshan City
E-main:fly-step@qq.com
Fax:0757- 85111193
Copyrilght©2020 Guangdong Tianbigao Sports Technology Co., Ltd 粤ICP备20051344号 Powered by : www.300.cn